Coating Application

Prestige Garage Floor Coating, specializes in commercial, industrial, and residential concrete coatings including, but not limited to warehouses, airplane hangars, garages, walkways, patios and driveways. For over a decade, our innovative process has been refined to ensure that your garage floor will have a style and sophistication that lasts for years. Our completed coating process (including preparation and installation) consists of a 2-3 day procedure. Prestige Garage Floor Coating uses the highest quality product that consists of proprietary-blended 100% solids coating compounds. These industrial grade coatings not only protect the concrete from weathering, cracking, oil and other chemicals, but they are aesthetically pleasing and easy to clean and maintain. Most of the coating materials we use in our processes are low or zero VOC’s (Volatile Organic Compounds).

Stage One

Each of our technicians is experienced in evaluating and preparing the concrete floor to meet our rigorous standards. The first stage of our coating process (the most critical to a durable finish) begins with our certified and experienced technicians preparing the concrete surface with a mechanical abrasion (diamond grinding) using state of the art dust reducing equipment. This step is required to achieve a porous and contaminant-free surface. We then perform any necessary crack, divot and joint repairs with an elastomeric sealer.

Stage Two

The next stage involves applying a primer “bond” coat to the prepared concrete (the material used is dependent on moisture readings taken at various stages of the prep process), creating a molecular bond with the concrete surface.

Stage Three

Once the bond coat has cured sufficiently, our technicians apply a polymer color coat and broadcast decorative poly-vinyl acetate chips to the wet color coat (if spec’d out). This coating is left to fully dry overnight.

Stage Four

The following day, our technicians prepare the previous day’s coating for the subsequent clear coat(s) by sanding and/or scraping the chips to achieve the desired texture.

Stage Five

They will follow this up with one or two clear Poly-Hybrid coats (depending on the coating system specified).

Stage Six (If Applicable)

The surface is lightly sanded and an additional clear coat is applied.

This completes the coating process and the surface can return to light service 24 hours later and heavier service including vehicular traffic 48 hours after completion. Various types of anti-skid  flooring media can be applied at the customer’s request to achieve varying profiles.

Maintenance

There is no required ongoing maintenance or re-applications to our coatings. We do, however recommend periodic cleaning of the coating, make sure to view our cleaning guidelines.

Conclusion

Prestige Garage Floor Coating is dedicated to providing the highest level of service and the highest quality products available on the market today.

MSDS and TDS sheets are available upon request.

Please contact us with any questions at 410-775-8004.

Contact Us
Blog Posts
How Long Will Epoxy Floors Last?

on September 27, 2018

Pros & Cons of an Epoxy Floor

on September 18, 2018

How to Maintain High Traffic Floors

on August 22, 2018

View More Blogs
Case Study
DIY vs. Prestige Floor Coating

The technicians and installers at Prestige Garage and Floor Coating are often asked how effective the discount kits at the big box home centers are. As we all know, big home centers sell (relatively) inexpensive one- and two-part kits from Rustoleum, Behr, and other manufacturers.

Read Full Post
Testimonials

The floor looks great, the guys are good workers, professional and very courteous. I appreciated having them here.

Read More Testimonials